OUR WORKS

 

Client        : PTT Cambodia Limited 

 Project     : 2 Million liter FO Tank

Location   : Ream oil Terminal,Cambodia                   

 Duration  : 2005 – 2006

 

Client        : PTT Cambodia Limited

Project     : Siem Reap Aviation Depot

Location   : Siem Reap Airport, Cambodia

Duration  : 2007 – 2008

 

Client          : TOTAL Cambodge

Project       : Siem Reap Aviation Depot

Location     : Siem Reap Airport, Cambodia

Duration    : 2008 – 2009

Value          : 0.858 Million USD

Client          : TOTAL Cambodge

Project        : 4.0 Million Liter Jet A-1 Tank

Location      : Phum Khsom Depot, Cambodia

Duration      : Jan 2009 – Oct 2009

 

Client          : PTT Cambodia Limited

Project        : 2 x 3.0 Million Liter FO Tank

Location      : Ream Oil Terminal, Cambodia

Duration      : March 2010 – October 2011

 

               

Client          : MONG RETHTHY INVESTMENT                                      CAMBODIA OIL PALM CO.,LTD

Project       : New CPO Storage Tanks ( 2 x 2,500 Tons)

Location    : Mong Reththy Investment Camobodia

                     Oil Plam

Duration     : March 2011 – Present

 

Client          : SIEMENS LIMITED

Project        : Complete waste water

                     treatment plant

Location     : Cambodia Beer

Duration     : October 2011 – February 2012

 

Client          : TOTAL CAMBODGE

Project       : Relocate Jet A-1 Loading                                       Facility and Construct new Gantry

Location     : Khsom Depot

Duration     : June 2011 – December 2011

 

Client        :   THARY TRADE IMPORT EXPORT CO., LTD

Project     :   Storage Tank 600 cu-m with Fire Fighting System

Location   :   Kampong Charm Province.

Duration  :   April 2012 – September 2012

 

Fabricate & Installation Warehouse at Malt Cello Extension

Client : KHMER BREWERY CO.,LTD

Project : Fabrication and installation for Happy Happy Project

Location: Khmer Brewery

Duration: 2013

 

Client        :   MRT – TCC SUGAR INVESTMENT CO., LTD

Project     :   CPO Tank (2 x 1,000 ton) and Molasses Tank 3,500 ton with Unloading Pipe 10” for Tanker

Location   :   AlongKropeu Palm Oil Mill project, Monorom 1, Choeungkor, Prey Nop, Sihanoukville.

Duration  :   July 2013 – September 2014

 

Client        :   TIPCO Asphalt (Cambodia) Company Limited

Project     :   1 Unit of 2,000 Tons Bitumen Storage Tank (Dia.15.286m x H.12.0m)

Location   :   Oknha Mong port

Duration  :   November 2014 – Present

 

 

Client        :   PTT Cambodia Limited

Project     :   EPCC Submarine Pipe Line 3 x 8” (3 line = 2,880 m)

Location   :   PTT Ream Oil Terminal

Duration  :   November 2013 – May 2014

 

Client          : Mr. Sourng Chamreou

Project       : Supply and install station equipment

Location     : Kartie province

Duration    : August 2011 – February 2012

 

Client          : TOTAL CAMBODGE       

Project       : Installation UG Tank Replacement

Location     : Phsar Leu

Duration    :  2012 –  2013

 

Client          : SOKIMEX        

Project       : Supply and Installation UG Tank Replacement

Location     : Battambang province

Duration    :  2013

 

Client          : SOKIMEX        

Project       : Supply and Installation UG Tank Replacement

Location     : Battambang province

Duration    :  2013

 

Client          : SOKIMEX        

Project       : Supply and Installation UG Tank Replacement

Location     : Battambang province

Duration    :  2013

 

KPS PIPE INSTALLED REFFERENCE

Client          : TOTAL CAMBODGE

Project       : Station equipment and signage installation

Location     : Steung Mean Chey  Total Service Station

Duration    : November 2011 – March 2012

 

Call us or fill out The Form for Estimate>>>
  • Black Facebook Icon
  • Black Twitter Icon
  • Black Google+ Icon
  • Black YouTube Icon
  • Black Pinterest Icon
  • Black Instagram Icon

Theme By George T. Utod Jr.

bottom of page